期刊文献+

大城市更新改造工程与可持续发展——概析波士顿中央干道/隧道改建工程 被引量:9

Renewal and Remodeling Project and Sustainable Development for Big City:Expatiation on the Boston's Central Artery/Tunnel Remodeling Project
原文传递
导出
摘要 从阐述波士顿中央干道/隧道改建工程入手,归纳了大都市前期规划及其后期更新改造的思路和特点。一方面论述了波士顿城市交通空间与开放空间的整合对拓展城市交通空间、修复城市肌理以及改善城市生态环境所产生的积极影响;另一方面通过对其施工理念与管理的介绍,为如何在不影响城市正常运转的情况下进行大规模的城市更新改造提供了创造性的实例。 Starting with expatiation on Boston's Central Artery/Tunnel Remodeling Project, the paper concludes the line of thinking and characteristics of big cities' early stage of planning and late stage of construction. It discusses the positive influence of the integration of traffic space with open space on urban city's traffic space extension, texture rehabilitation and environment melioration, as well as provides a creative example of large-scale construction without disordering the city's daily operation through the introduction of innovative construction ideas and management. Boston's successful experience is an important reference to improve both transportation and open space in China, and overall development of the city, transportation and buildings.
机构地区 浙江大学建筑系
出处 《建筑学报》 北大核心 2008年第5期47-50,共4页 Architectural Journal
关键词 波士顿中央干道/隧道工程 开放空间 施工理念与管理 可持续发展 Boston's Central Artery/Tunnel Project, open space, construction idea and management, sustainable develonment
  • 相关文献

参考文献8

  • 1The Big Dig[EB/OL].http://www.masspike.com/bigdig/index.html.
  • 2Project Background[EB/OL].http://www.masspike.com/bigdig/background/index.html.
  • 3Project Schedule and Timeline[EB/OL].http://www.masspike.com/bigdig/updates/timeline.html.
  • 4Parks and Urban Restoration[EB/OL].http://www.masspike.com/bigdig/parks/index.html.
  • 5David Beck,Frederick Hughes.Central Artery to pump new life into Boston[J].The American City&County,Jun 1999,Vol,114,Iss.6:58-72.
  • 6Robert Campbell,FAIA.The Big Dig:What's Up Under Boston?Architectural Record.New York:March 2002.Vol.190.Iss.3:84-87.
  • 7朱俊夫.南波士顿海港公共区域改造[J].北京规划建设,2007(3):109-112. 被引量:2
  • 8孟宇.城市中心区交通设施更新实例——波士顿中央干道/隧道工程[J].国外城市规划,2006,21(2):87-91. 被引量:18

二级参考文献9

  • 1Alan Altshuler,David Lubcroff.Mega-proiccts:the changing politics of urban public investment. Washington, D.C.: Cambridge, Mass.2003.
  • 2David Beck,Frederick Hughes.Central Artery to pump new life into Boston. The American City & County. Jun. 1999.Vol. 114. Iss, 6,
  • 3Richard A Dimino,Partnerships Vital to Project's Success, Public Works. East Stroudsburg: Sop 2004.Vol.135, Iss. 10.
  • 4Robert Campbell, FAIA. The Big Dig: What's Up Under Boston? Architectural Record. New York: March,2002.Vol. 190, Iss. 3
  • 5Mark Favermann. Paradise Potentially Lost, or Filling in the Big Dig. Art New England 24 no5 5 Ag/S 2003.
  • 6Raphael Lewis,Sean P. Murphy.Artery errors cost more than SIb.The Boston Globe. 2/9/2003.
  • 7Jane Holtz Kay. The hub is hot, Planning. Chicago: Mar 1998. Vol. 64, Iss. 3
  • 8http://www.bigdig.com
  • 9http://www.boston.com

共引文献18

同被引文献107

引证文献9

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部