期刊文献+

缩短交货提前期费用共担的供应链决策 被引量:4

Supply chain decision-making considering delivery time crashing cost sharing
在线阅读 下载PDF
导出
摘要 为研究在缩短交货提前期费用共担条件下,由2个零售商和1个供应商组成的供应链决策问题,建立供应商先公布交货提前期零售商再决定其订购量的决策模型.证明该模型中的供应商和零售商均存在1个最优决策,通过计算给出使供应链总成本最小的基于缩短交货提前期费用共担的交货策略和零售商与供应商的费用分担比例.结合具体算例,证实上述模型的实用性和有效性. Considering the sharing of delivery time crashing cost, the decision-making of a supply chain consisting of one supplier and two retailers, and the decision model is presented in which the supplier declares delivery lead time first, and then the retailer determines order quantity is studied. It shows that there exist the optimal decisions for both supplier and retailers. The proposed model presents the delivery strategy based on lead time crashing cost sharing and lead time crashing cost sharing proportion by retailers and supplier in order to minimize the total supply chain cost. A numerical example is given to demonstrate the effectiveness of the proposed model.
出处 《上海海事大学学报》 北大核心 2008年第2期48-51,共4页 Journal of Shanghai Maritime University
基金 上海市曙光计划项目(06SG48)
关键词 物流 交货提前期 供应链 库存成本 logistics delivery lead time supply chain inventory cost
  • 相关文献

参考文献6

  • 1LIAO C J, SHYU C H. An analytical determination of lead time with normal demand [J]. Int J Operations & Production Manage, 1991, 11(9) : 72-78.
  • 2BEN-DAYA M, RAOUF A. Inventory models involving lead time as decision variable[ J]. J Operational Res Soc, 1994, 45 (5) : 579-582.
  • 3刘蕾,唐小我.基于缩短交货期费用分担的供应商交货策略[J].系统工程,2005,23(8):42-45. 被引量:7
  • 4李琳,周永务.弹性需求下带有分摊运费的供应链协调策略[J].计算机集成制造系统,2007,13(1):171-177. 被引量:12
  • 5ZIPKIN P. Foundations of inventory management [ M ]. USA : McGraw-Hill Higher Education, 2000.
  • 6KARMARKAR U S, KEKER S. Manufacturing configuration, capacity and mix decisions considering operational costs [ J]. J Manufacturing Syst, 1987, 6(4) : 315-324.

二级参考文献25

  • 1Stalk G Jr. Time - The next source of competitive advantage[J]. Harvard Business Review, 1988, (July~August):41-51.
  • 2Bower J L,Hout T M. Fast-cycle capability for competitive power[J]. Harvard Business Review, 1988,(November~ December) : 110-118.
  • 3Merrills R. How Northern Telecom Competes ontime[J]. Harvard Business Review, 1989, (July~August) : 108- 14.
  • 4Stalk G Jr, Hout T M. Competing against time[M].New York :The Free Press, 1990.
  • 5Liao C J,Shyu C H. An analytical determination of lead time with normal demand [J]. International Journal of Operations & Production Management,1991, 11 (9) :72-78.
  • 6Ben Daya A M,Raouf A. Inventory models involving lead-time as decision variable [J]. Journal of the Operational Research Society, 1994,45 (5) : 579 - 582.
  • 7Ouyang L Y, Chang H C. Lot size reorder point inventory model with controllable lead time and set-up cost [J]. International Journal of Systems Science, 2002,33 (8) : 635 - 632.
  • 8Moon I,Choi S. A note on lead time and distributional assumptions in continuous review inventory models[J]. Computers and Operations Research,1998, 25: 1007-1012.
  • 9Hariga M, Ben-Daya M. Some stochastic inventory models with deterministic variable lead time [J].European Journal of Operational Research, 1999,113:42-51.
  • 10Hariga M, Ben-Daya M. Leadtime-reduction in a stochastic inventory system with learning considera-tion [J ]. International Journal of Production Research, 2003,41 (3) : 571- 579.

共引文献17

同被引文献30

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部