摘要
通过巧妙建立物料运输规划的数学模型并进行求解,可分别在不考虑时间因素的条件下和考虑时间因素的条件下,寻找到总体费用最小的物料调运方案,在隧道施工中,能节省大量的物料调运费用,缩短物料运输时间,缩短工程工期。
By establishing the construction material delivery planning modeland by solving the model, the optimaldelivery plan can be achieved under the condition without considering the time factor and considering the time factor respectively. In tunnel construction practices, this kind of optimal delivery plan can save a large amount of delivery fees and transportation time and as result can shorten the construction period.