期刊文献+

南水北调中线沿线劣质地下水对输水水质的潜在风险分析 被引量:8

Potential Risk Analysis for Impact of Contaminated Groundwater on Water Quality in Middle Route of the South-to-North Water Diversion Project
在线阅读 下载PDF
导出
摘要 确保南水北调中线工程供水水质安全是工程运行成功的关键。现通过对中线工程总干渠沿线地下水进入渠道可能性分析的基础上,建立典型渠段数值模型定量计算地下水与渠系水在水量与水质的转化。研究结果表明:工程内排排水的布设使地下水与渠系水存在水量与水质的紧密联系;地下水向渠道的排入量取决于地下水水位与总干渠渠道水位之间水位差的变化情况以及区域水文地质条件;根据现有资料基础上的河北磁县境内渠段模拟计算结果,即使在假定的污染风险达到极大的情况下,排入渠道的劣质地下水对渠系水水质基本不构成影响。 It's one of the most important issues to ensure water quality in Middle Route of the South-to-North Water Diversion Project (SNWDP). Based on the possibility analysis which groundwater might drain into the main canal of the SNWDP, the numerical model for the CIXIAN section was set up for quantitatively simulating the interaction of Water quality and quantity between canal water and groundwater along the canal. The results showed that the comprehensive interaction existed, which was affected by the dynamic variation of the water-head difference between canal water and groundwater as well as regional hydrogeologic conditions. According to the simulation calculations,there was no impact on canal water quality even under the most serious scenario in which the groundwater along the CIXIAN section was contaminated very seriously.
出处 《南水北调与水利科技》 CAS CSCD 2008年第5期1-3,12,共4页 South-to-North Water Transfers and Water Science & Technology
基金 国家重点基础研究发展计划(973)项目专项经费资助(2005CB724202) 创新研究群体科学基金资助项目(50221903)
关键词 南水北调 中线工程 地下水 风险分析 the South-to-North Water Diversion Project middle route groundwater risk analysis
  • 相关文献

参考文献9

  • 1刘昌明.南水北调工程对生态环境的影响[J].海河水利,2002(1):1-5. 被引量:37
  • 2刘正才,王家永.南水北调中线工程水源地水质保护工作研究[J].南水北调与水利科技,2005,3(4):7-9. 被引量:6
  • 3[3]Sophocleous M.Interactions between groundwater and surface water:The state of the science[J].Hydrogeology Journal,2002,10(1):52-67.
  • 4罗玉峰,崔远来,郑祖金.河渠渗漏量计算方法研究进展[J].水科学进展,2005,16(3):444-449. 被引量:34
  • 5[6]H.E.M.Moghazi,E,-S.lsmail A study of losses from field channels under arid region conditions[J].Irrig Sci,1997,(17):105-110.
  • 6[14]SL 18-91,渠道防渗工程技术规范[S].
  • 7SL/T191-96水工混凝土结构设计规范
  • 8[11]Michael G.McDonald,Arlen W.Harbaugh.MODFLOW:A modular three-dimensional finite-difference groundwater flow model[M].U.S Geological Survey Open-File Report,Washington,1988.
  • 9[12]HJ/T 2.3-93,环境影响评价技术导则地面水环境[S].

二级参考文献29

  • 1惠士博,谢森传,纪瑞森,牛连和.京密引水渠渗漏对南邵乡地下水补给分析[J].北京水利,1994(3):21-26. 被引量:4
  • 2田士豪,李林荣,方彦军,艾树衡.静水法渠道测渗计算[J].农田水利与小水电,1995(8):14-17. 被引量:14
  • 3张蔚榛 沈荣开.河渠影响下双层结构含水层中地下水非稳定流计算(双层结构含水层情况)[J].武汉水利电力学院学报,1982,(1):1-13.
  • 4Bouwer H. Theory of seepage from open channels[J]. Advances in Hydroscience, 1969, 5:121 - 172.
  • 5Wachyan E, Rushton K R. Water losses from irrigation canals[J]. Journal of Hydrology,1987, 92:275- 288.
  • 6Rastogi A K, Prasad B. FEM modelling to investigate seepage losses from the lined Nadiad branch canal[J]. Journal of Hydrology, 1992,138:153 - 168.
  • 7Soneneshein R S. Methods to quantify seepage beneath levee 30, Miami-Dade County, Florida[M]. United States Geological Survey, Waterresources investigations Report 01 - 4074, 2001, 36.
  • 8Luo Y F, Khan S, Cui Y L, et al. Understanding transientlosses from irrigation supply systems in the Yellow River Basin Using a surfacegroundwater interaction model[ A]. Proceedings of MODSIM 2003-International Congress on Modelling and Simulation, Townsville, Queensland [C]. Australia. 2003, 242- 247.
  • 9Osman Y Z. Modeling stream-aquifer seepage in an alluvial aquifer: an improved loosing- stream package for MODFLOW[J]. Journal of Hydrology, 2002, 264: 69 - 86.
  • 10Harbaugh A W, McDonald M G. User's documentation for MODFLOW-96, an update to the U.S. Geological Survey modular finite-difference ground-water flow model[M]. U.S. Geological Survey Open-File Report 96- 485, 1996, 56.

共引文献86

同被引文献90

引证文献8

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部