海底管道拖管法分析和研究 被引量:16

Study and Analysis of Submarine Pipeline Laying using Tow Method
在线阅读 下载PDF
导出
摘要 海底管道铺设是海洋油气工程建设的一项重要内容。海底管道铺设的方法有铺管船法和拖管法。铺管船法受铺管船舶资源的限制,而拖管法铺管不依赖铺管船,在一定的条件下,可以节约费用,因此研究拖管法铺管就非常有意义。文中首先介绍各种管道铺设施工方法,并对各种方法的优缺点进行比较。然后分别分析研究了浮拖法、底拖法和离底拖法三种拖管方法的施工工艺及管道应力变形,并结合实例对三种拖管方法的拖管过程进行了分析。 Pipe-lay is an important activity in offshore oil and gas engineering, the methods of which include S-lay, J-lay, Reel and tow. The lay barge method is restricted by lay barge resources. Tow method does not depend on lay barges. In certain conditions, tow method could save money and speed up exploitation of offshore oil and gas field. So it is valuable to study tow methods. Different pipe-lay methods are introduced and compared. Then the techniques of surface tow method, bottom tow method and off-bottom tow method and the stress and deformation of the pipeline are studied respectively. The case study of the three tow methods is also given.
出处 《海洋技术》 2008年第3期84-89,共6页 Ocean Technology
基金 国家自然科学基金资助项目(50579047) 教育部博士点基金(20060056023)
关键词 海底管道 拖管法 底拖法 浮拖法 离底拖法 submarine pipeline tow method bottom tow method surface tow method off-bottom tow method
  • 相关文献

参考文献8

二级参考文献31

  • 1[15]Song, R. and Clausen, T, "Reliability-based Limit State Design of Metallic Risers", Proceedings of the 4th International Conference of Advances in Riser Technologies, Aberdeen, UK, May 24th - 25th, 1999
  • 2[16]Song, R. and Bai, Y., "Burst Reliability of Damaged Offshore Pipelines", the Proceedings of the 8th International Offshore and Polar Engineering Conference (ISOPE'98), Montreal, Canada, May 1998
  • 3[17]Sotberg, T and Bruschi R., (1992): "Future Pipeline Design Philosophy - Framework", Proceedings of OMAE'92
  • 4[18]Sotberg, T and Leira, B (1994): "Reliability Based Pipeline Design and Code Calibration", Proceedings of OMAE'94
  • 5[19]Zimmerman, et al. (1992): "Development of Limit State Guideline for the Pipeline Industry". Proceedings of OMAE'92
  • 6[1]ABS (2001): "Guide for Building and Classing Undersea Pipelines and Risers"
  • 7[2]API RP 1111 (1998): "Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines - Limit State Design"
  • 8[3]API RP 2RD (1998): "Design of Risers for Floating production Systems and Tension Leg Platforms", First Edition,1998
  • 9[4]ASME B31.8 (1992): "Code for Gas Transmission and Distribution Piping Systems" (1994 Addendum)
  • 10[5]ASME B31.4 (1992): "Code for Liquid Trans Transportation System for Hydrocarbons, Liquid Petroleum Gas,Anhydrous Ammonia and Alcohol's"

共引文献56

同被引文献85

引证文献16

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部