摘要
根据王家坝水文站的基本资料,分析了含沙量、输沙量变化趋势及断面的河相关系,得出了重要结论。
The original materials used were gathered at Wangjiaba Hydrometric Station. The analysis is mainly based on the annual variation of the sand content, its delivery and the cross-section feature at Wangjiaba. Corresponding conclusion is got.
出处
《安徽水利水电职业技术学院学报》
2008年第3期7-9,共3页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
王家坝水文站
含沙量
输沙量
Wangjiaba Hydrometric Station
sand content
sand delivery