单戗立堵截流在黄丰水电站施工中的应用 被引量:1

Application of end-tipped closure with single bank to construction of Huangfeng Hydropower Station
在线阅读 下载PDF
导出
摘要 以黄丰水电站为例,详细介绍了黄丰水电站截流施工方案、施工过程,说明截流最终落差在3m左右、龙口流速6~7m/s左右的截流工程,只要采取可靠技术措施,配备足够的大型施工机械,现场施工组织得力,单戗立堵截流方式是较为经济合适的施工方式。 Taking the construction of Huangfeng Hydropower Station as a study case, the construction scheme and construction process of the river closure concerned are described herein. It shows that the construction method of end-tipped closure with single bank is a more suitable and economical construction method for the river closure project with the final closuring water head of about 3 m and the flow velocity at closure gap of about 6 - 7 m/s, so long as reliable technical measures are adopted along with enough large construction equipments and better construction organization in site.
出处 《水利水电技术》 CSCD 北大核心 2008年第10期79-82,89,共5页 Water Resources and Hydropower Engineering
关键词 水电工程 施工截流 单戗立堵 黄丰水电站 hydropower project construction closure end-tipped closure with single bank Huangfeng Hydropower Station
  • 相关文献

参考文献9

二级参考文献6

  • 1肖焕雄,施工水力学,1992年
  • 2熊治平,1990年
  • 3李贞儒,1983年
  • 4钱宁,泥沙运动力学,1983年
  • 5肖焕雄,武汉水利电力学院学报,1977年,1期
  • 6肖焕雄,武汉水利电力学院学报,1976年,2期

共引文献35

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部