期刊文献+

城市污水处理厂冬季和夏季污水处理效果分析 被引量:2

Analysis of Wastewater Treatment Effect from Municipal Wastewater Treatment Plant in Winter and Summer
在线阅读 下载PDF
导出
摘要 以兰州市雁儿湾污水处理厂实际运行资料为背景,对污水处理厂冬季和夏季污水处理效果进行比较分析。研究发现:污水处理厂对COD的平均去除率在79%左右,对BOD的平均去除率在87%以上,均能保证出水达标,对COD和BOD的去除效果冬季和夏季无明显差异,对SS的去除效果夏季优于冬季。研究结果对城市污水处理厂的设计具有重要的指导意义和实用价值。 Taking actual running of Yanerwan Wastewater Treatment Plant in Lanzhou City as example, effect of wastewater treatment in summer and winter was compared and analyzed. Results showed that average removal efficiency of COD and BOD was around 79% and 87%, both of which can meet discharge standard. Removal efficiency of BOD and COD was almost the same in summer and winter, while that of SS in summer was better than that in winter. The study had a directive and practical importance to design of wastewater treatment plant.
出处 《环境科学与技术》 CAS CSCD 北大核心 2008年第11期124-126,共3页 Environmental Science & Technology
关键词 城市污水 处理效果 活性污泥 去除率 municipal wastewater treatment effect activated sludge removal efficiency
  • 相关文献

参考文献7

二级参考文献13

共引文献452

同被引文献19

引证文献2

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部