期刊文献+

大型项目中的支付调度问题

A Study on the Problems of Payment Scheduling in Large-Scale Projects
在线阅读 下载PDF
导出
摘要 在大规模复杂的项目投资和调度方面,对如何在满足项目的预定目标下使净现值达到最大的问题,首先引入AoA网络并建立一个具有线性约束和非凹目标函数的支付调度问题的数学模型;然后证明问题可以变换为等价的线性规划问题;最后给出了模型的有效求解方法和经济上的解释,并附以一个具体的例子。 Discussion on the investment and scheduling of large scale complex project is the focus of this paper. In this respect, how to maxmize the NPV when satisfying the schedule aim based on the construction of logistics project is being discussed. AoA is firstly introduced and a mathematic model of payment scheduling problem which is a nonlinear program with linear constraint and nonconcave objective function is established. Then, the question that the program can be transformed into a linear program equal in value is proved. In the end, an effective method to solve the model and the explanation in economy are proposed with a specific example.
作者 崔媛 李国辉
机构地区 天津职业大学
出处 《天津职业大学学报》 2008年第5期68-71,共4页 Journal of Tianjin Vocational Institute
关键词 支付调度 净现值 线性规划 payment scheduling NPV linear program
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部