摘要 长距离输水隧洞的TBM施工技术复杂,工序繁多,且受到众多不确定性因素(尤其是地质条件)的影响,给工程施工进度的安排及计划带来了相当的风险。在分析围岩岩性分布随机特性的基础上,提出了基于Markov过程的地质岩性风险预测方法,确定了沿隧洞轴线上岩性的分布概率,克服了以往方法难以量化地质风险的弊端,为定量分析地质风险提供了新的途径。在顾及岩性不确定性和工作活动时间随机性条件下,建立了针对不同岩性的TBM施工随机循环网络仿真模型,采用Monte-Carlo方法,对工程工期、完工概率以及资源利用情况进行了风险分析。工程实例应用表明本方法的可行性及有效性。 There are many obstacles during the tunnel boring machine (TBM) construction of long water tunnel, which consist of complex construction techniques, various working procedures, and being affected by many uncertain factors, especially the geologic uncertainty. These would cause great risk for project planning and construction scheduling. Analyzing on the stochastic characteristics of the geologic spatial tendency, a method of geologic prediction was based on Markov process. With this method, the geologic state probabilities along the horizontal alignment of the tunnel could be determined. This is a new approach to quantitative analyses of the geological risk which the traditional methods have difficulty in measuring. Under consideration of the uncertainties of the geology and work activities duration, the models of stochastic cyclic network simulation (CYCLONE) for different geologic states were built. Using the Monte-Carlo simulation, the schedule risks, such as the reliability of project completion and the utilization rate of working resources, were obtained. The application of practical project shows that the method is feasible and effective.
出处 《系统仿真学报》 CAS CSCD 北大核心 2009年第2期558-562,共5页 Journal of System Simulation
基金 国家自然科学基金(50709024)
关键词 TBM施工 施工进度 风险分析 随机循环网络仿真 地质预测 MARKOV过程 TBM construction scheduling risk analysis stochastic cyclic network simulation geologic prediction Markov process
  • 相关文献

参考文献14

二级参考文献36

  • 1曹光明,白思俊.国外PERT/CPM网络计划技术发展的三个方面[J].系统工程理论与实践,1993,13(3):1-10. 被引量:35
  • 2钟登华.循环仿真随机网络在隧洞施工中的应用[J].土木工程学报,1994,27(4):70-74. 被引量:7
  • 3姚姚.地球物理非线性反演模拟退火法的改进[J].地球物理学报,1995,38(5):643-650. 被引量:70
  • 4John H Doveton 见:Jeffrey M Yarus Richard L Chambers编 穆龙新 陈亮译.马尔可夫链分析在垂向变异性度量中的理论和应用[A].见:Jeffrey M Yarus,Richard L Chambers编,穆龙新,陈亮译.随机建模和地质统计学-原理方法和实例研究[C].北京:石油工业出版社,2000..
  • 5赵永军 李汉林.石油数学地质[M].东营:石油大学出版社,1998..
  • 6Davis, E ·W., Project Scheduling Under Resource Constraints Historical Review and Categorization of Procedures [J], AIIE Trans.,1973,5(4.).297~312
  • 7D·G· Malcolm, J·H· Roseboom, Application of A Technique for Research and Development Evaluation[J], J. opns. Res., 1959(7). 646~669.
  • 8纪友亮,层序地层学原理及层序成因机制模式,1998年,152页
  • 9魏魁生,非海相层序地层学.以松辽盆地为例,1996年,6页
  • 10李思田,含能源盆地沉积体系.中国内陆和近海主要沉积体系类型的典型分析,1996年,114页

共引文献104

同被引文献110

引证文献9

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部