南水北调中线北京段PCCP管道工程进度管理实践 被引量:5

Large-Diameter PCCP Pipeline Construction Progress Control
在线阅读 下载PDF
导出
摘要 南水北调中线北京段PCCP管道工程是国内首次大规模使用4m直径PCCP的项目,进度控制面临很大的挑战。通过建立进度管理体系、分级制定切实可行的进度计划、实施有效的过程跟踪、抓住关键线路和关键工作、及时分析进度并进行调整、及时研究解决各项重大技术问题等措施,保证了工程顺利完成。 PCCP Pipeline Project in Beijing of the Middle Route Project of South to-North Water Diversion is the first large-scale use of 4m diameter PCCP project, progress control faces great challenges. We adopted the following measures to ensure the project successful completion such as to establish schedule management system grade and formulate practical progress schedule, to make effectively follow-up process, to seize the key lines of work, to analyze progress timely and to adjust accordingly, to study and solve major technical problems.
出处 《南水北调与水利科技》 CAS CSCD 2009年第2期16-17,28,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调中线 PCCP 管道工程 进度管理 实践 Middle Route Project of South-to-North Water Diversion prestressed concrete cylinder pipe pipeline project schedule management practice
  • 相关文献

参考文献3

共引文献3

同被引文献34

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部