以忠县长江大桥11号墩主塔施工为例,重点介绍液压自爬模系统爬升施工技术要点、保证措施,以及液压自爬模系统设计中对于适应主塔结构所做的变更设计。
Taking the construction of the pylon atop Pier No. 11 of Zhongxian Changjiang River Bridge as an example, this paper mainly presents the key points and assurance measures of the climbing construction techniques for hydraulic self-climbing form system and the varied design made for the form system in the design process in order to accommodate pylon structure.