摘要
从工效学原理出发,运用模特排时法(MOD)对某公司装配线流程和节拍进行测定与分析,指出该工段在任务分配、操作方法、标准时间等方面存在的缺陷,在此基础上,运用动作经济原则提出改进方案,并对改进前后的结果进行了对比分析,结论证明改进效果明显。
Based on the principle of Ergonomics, the flow process and rhythm on assembly line in the company are measured and analyzed carefully by MOD method and problems of the working distribution, operation ways, working hour in the streamline are pointed out. According to the economical actions principle, the paper presents an improvement to the above - mentioned, which plays an important part in reducing the job time and enhancing the whole streamline balance. Through the contrast and analysis between old and new project, it proves the improvement in effect is very obvious.
出处
《人类工效学》
CSSCI
2009年第2期14-17,共4页
Chinese Journal of Ergonomics