摘要
介绍了换乘站综合监控系统设置原则,通过对深圳地铁1号线续建线与5号线换乘站宝安中心站综合监控系统建设的实例分析,探讨了换乘站综合监控系统接入方案,并介绍了工程建设应注意的问题。
The setting principle of integrated supervisory control system in transfer station is introduced. By analyzing the construction case of integrated supervisory control system of Baoan Center Station, the transfer station of continued line of Shenzhen Metro Line 1 and Shenzhen Metro Line 5, the access scheme of integrated supervisory control system in transfer station is discussed, and the issues of engineering construction for attention are introduced.
出处
《现代城市轨道交通》
2009年第4期24-26,共3页
Modern Urban Transit