摘要
湛江奥里油发电厂2×600MW锅炉国内首座专门为燃烧奥里油设计生产的锅炉,对该电厂锅炉带不到设计负荷、输灰系统不畅、空气预热器堵塞的原因进行了分析,对解决这些问题的方法进行了探讨,给出了解决这些问题的方法。
The 2×600 MW boiler of Zhanjiang Orimulsion Power Plant is the first boiler specially designed for burning orimulsion oil. Some problems existed in the plant,such as that the boiler can not get designed load,the ash conveying system was blocked,the air preheater was blocked and others. The reasons of these problems were analyzed,and,by research,the methods solving these problems were given.
出处
《华电技术》
CAS
2009年第12期61-63,共3页
HUADIAN TECHNOLOGY
关键词
奥里油
锅炉
输灰系统
空气预热器
orimulsion
boiler
ash conveying system
air preheater