期刊文献+

西线一期工程混凝土面板坝与黏土心墙坝坝型比较研究——以扎洛坝址为例 被引量:1

The Study of Dam Type Comparison between Concrete Faced Rock-Filled Dam and Embankment Dam with a Clay Core in First Stage of the Western Route Water-Transfer Project——Dam type comparison at Zhaluo dam site
在线阅读 下载PDF
导出
摘要 根据地形、地质条件及当地筑坝材料分析,扎洛坝址为西线一期工程有可筑坝土料的高坝坝址,具备修建混凝土面板堆石坝和黏土心墙坝的条件。进一步的研究和论证结果表明,修建混凝土面板堆石坝和黏土心墙坝在技术上都是可行的,混凝土面板堆石坝方案在投资、工期及施工方面,优势明显。 According to the topographical,geological conditions and analysis of local dam materials,there is enough available earth materials at Zhaluo site for the construction high dam,and both concrete faced rock-filled dam and embankment dam with a clay core are suitable construction at this site.Further studies and comparisons indicated that both types of dam were technically feasible,and concrete faced rock-filled dam had distinct advantage in cost,project period and construction.
出处 《南水北调与水利科技》 CAS CSCD 2009年第6期167-169,共3页 South-to-North Water Transfers and Water Science & Technology
基金 南水北调西线一期工程坝型比较研究专题
关键词 扎洛坝址 坝型比较 混凝土面板堆石坝 黏土心墙坝 Zhaluo dam site dam type comparison concrete faced rock-filled dam embankment dam with clay core
  • 相关文献

参考文献12

二级参考文献3

共引文献70

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部