摘要
根据地形、地质条件及当地筑坝材料分析,扎洛坝址为西线一期工程有可筑坝土料的高坝坝址,具备修建混凝土面板堆石坝和黏土心墙坝的条件。进一步的研究和论证结果表明,修建混凝土面板堆石坝和黏土心墙坝在技术上都是可行的,混凝土面板堆石坝方案在投资、工期及施工方面,优势明显。
According to the topographical,geological conditions and analysis of local dam materials,there is enough available earth materials at Zhaluo site for the construction high dam,and both concrete faced rock-filled dam and embankment dam with a clay core are suitable construction at this site.Further studies and comparisons indicated that both types of dam were technically feasible,and concrete faced rock-filled dam had distinct advantage in cost,project period and construction.
出处
《南水北调与水利科技》
CAS
CSCD
2009年第6期167-169,共3页
South-to-North Water Transfers and Water Science & Technology
基金
南水北调西线一期工程坝型比较研究专题
关键词
扎洛坝址
坝型比较
混凝土面板堆石坝
黏土心墙坝
Zhaluo dam site
dam type comparison
concrete faced rock-filled dam
embankment dam with clay core