期刊文献+

高速铁路用弹簧钢38Si7的开发 被引量:3

Development of 38Si7 Spring Steel for High-speed Railway
在线阅读 下载PDF
导出
摘要 介绍高速铁路用弹簧钢38Si7线材生产技术要求和工艺开发过程,从孔型系统、料型制度、生产管理等方面进行了优化,逐渐扩大南钢高速铁路用弹簧钢38Si7线材市场占有力。 The paper introduces technical requirement and process development of 38Si7 spring steel wire for high-speed railway. Market share has been increased by optimizing the pass system, feed-type system and production management and so on.
作者 彭学艺
出处 《南钢科技与管理》 2009年第4期17-19,共3页 NISCO Technology and Management
关键词 弹簧钢 38Si7 开发 spring steel 38Si7 development
  • 相关文献

同被引文献30

  • 1韩志强.弹条扣件的发展及高速铁路的扣件选择[J].山西建筑,2005,31(7):131-133. 被引量:12
  • 2毛新平,孙新军,康永林,林振源.薄板坯连铸连轧Ti微合金化钢的物理冶金学特征[J].金属学报,2006,42(10):1091-1095. 被引量:69
  • 3卢祖文.高速铁路轨道技术综述[J].铁道工程学报,2007,24(1):41-54. 被引量:60
  • 4Nam W J, Lee C S, Ban D Y. Effects of alloy additions and tempering temperature on the sag resistance of Si-Cr spring steels [J]. Materials Science and Engineering,2000,A289: 8-17.
  • 5Akio Yoneguchi, Jeffere Schaad, Yutaka Kurebayashi, et al. Development of High Strength Spring Steel and Its Application to Automotive Coil Spring [ J]. 2000 Society of Automotive Engineers. Inc: 10.
  • 6Barani A A, Ponge D, Raabe D. Refinement of grain bound- ary carbides in a Si-Cr spring steel by thermo-mechanical treat- ment[J]. Materials Science and Engineering,2006, A426:194.
  • 7钢铁材料手册总编辑委员会.钢铁材料手册(第8卷弹簧钢)[M].北京:中国标准出版社,2003:72-86.
  • 8Jinfeng Yang, Wei Tao, Manhua Liu, et al. An efficient direction field- based method for the detection of fasteners on high-speed railways [ J ]. Sensors, 2011 ( 11 ) : 7364-7365.
  • 9Charlie R Brooks, Ashok Choudhury. Failure Analysis of Engineering Materials[ M ]. New York: McGraw-Hill Professional Publishing, 2001.
  • 10Hui Weijun, Dong Hart, Weng Yuqing, et al. Long life high strength steels to resist fatigue failure and delayed fracture [ C ]//Advanced Steels. Berlin Heidelberg: Springer, 2011: 137-139.

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部