期刊文献+

基于HLA的测控资源调度仿真系统设计 被引量:1

TT&C Resource Scheduling Simulation System Design Based on HLA
在线阅读 下载PDF
导出
摘要 基于HLA架构对航天测控资源调度系统设计进行了研究。从测控调度问题的基本特点和流程出发,对软件的总体结构,功能设计、各主要类的设计和相互关系、调度模型和调度算法的设计等关键技术进行了研究。在建立基于CSP的系统描述模型和启发式调度算法的基础上,设计开发了具备联邦成员特点,能够与未来航天总体仿真系统顺利集成能力的航天测控资源调度软件系统.通过仿真试验,验证了系统的可用性。 The design ofa TT&C resource scheduling simulation system was studied on the base of HLA/RTI infrastructure. Firstly the characteristic and main process of TT&C scheduling was analyzed. Then the key technology was researched including system framework, classes and interrelation between classes, etc. Then based on the CSP model and heuristic algorithm, a software system was designed which had characteristic of a HLA Federate and could be easily incorporated in the space equipment overall simulation system. Finally, the simulation result shows the feasibility of the method and software system.
出处 《系统仿真学报》 CAS CSCD 北大核心 2010年第2期362-365,共4页 Journal of System Simulation
关键词 测控 资源调度 软件设计 高层体系结构(HLA) 约束满足问题(CSP)模型 TT&C resource scheduling software design HLA CSP
  • 相关文献

参考文献12

  • 1Chien S, Rabideau G. ASPEN-Automating Space Mission Operations Using Automated Planning and Scheduling [C]// 6th International Space Ops Symposium (Space Operations), Toulouse, France, 2000.
  • 2Clement B J, Johnston M D. Design of a Deep Space Network Scheduling Application [C]// Proceedings of the International Workshop on Planning and Scheduling for Space (AAAI2006), Baltimore, USA, 2006.
  • 3Fukunaga A S, Rabideau G, Chien S, et al. ASPEN:A Framework for Automated Planning and Scheduling of Space Control and Operation [C]// Symposium on AI, Robotics and Automation in Space (iSAIRAS) Tokyo, Japan, 1997.
  • 4Johnston M D, Clement B J. Automating Deep Space Network Scheduling and Conflict Resolution [C]// Proc. ISAIRAS 2005 Conference, Munich, Germany. 2005: 1483-1489.
  • 5Rao J D, Soma P, Padmashree G S. MULTI-SATELLITE SCHEDULING SYSTEM FOR LEO SATELLITE OPERATIONS [C]//Space Ops-98, Tokyo, Japan, 1998.
  • 6Soma P, Venkateswartu S, Santhalakshmi S. Multi-Satellite Scheduling Using Genetic Algorithms [C]// Space Ops 2004, Montreal, Canada, 2004.
  • 7金光,武小悦,高卫斌.卫星地面站资源配置仿真研究[J].系统仿真学报,2004,16(11):2401-2403. 被引量:32
  • 8李元新,吴斌.基于遗传算法的测站资源优化分配方法研究[J].飞行器测控学报,2005,24(4):1-5. 被引量:9
  • 9李云峰,武小悦.STK/Scheduler在卫星数传调度中的应用研究[J].计算机仿真,2008,25(3):70-74. 被引量:5
  • 10Barbulescu L, Howe A, Whitley D. AFSCN Scheduling: How the Problem and Solution Have Evolved [J]. Mathematical Computer Modelin (S0895-7177), 2006, 43(9-10): 1023-1037.

二级参考文献18

  • 1金光,武小悦,高卫斌.卫星地面站资源配置仿真研究[J].系统仿真学报,2004,16(11):2401-2403. 被引量:32
  • 2金光,武小悦,高卫斌.卫星地面站资源调度优化模型及启发式算法[J].系统工程与电子技术,2004,26(12):1839-1841. 被引量:41
  • 3Tadao Murata. Petri Nets: Properties, Analysis and Applications [J]. Proc. IEEE, 1989, 77(4): 541-580.
  • 4周明 孙树栋.遗传算法原理及应用[M].北京:国防工业出版社,2000..
  • 5吴斌 黄永宣.中低轨道卫星多星测控存在的问题及改进措施[C]..2003年航天测控技术研讨会论文集[C].银川,2003..
  • 6翟政安.航天测控网资源分配原则和调度方法[C]..2003年航天测控技术研讨会论文集[C].银川,2003..
  • 7Laura Barbulescu, Adele Howe, Darrell Whitley. AFSCN Scheduling: How the Problem and Solution Have Evolved [ J ]. Mathematical and Computer Modeling, 2006, 43 (9) : 1023-1037.
  • 8T D Gooley. Automating the Satellite Range Scheduling Process [ D]. Ohio: Air Force Institute of Technology, 1993.
  • 9S A Parish. A Genetic Algorithm Approach to Automating Satellite Range Scheduling[ D]. Ohio: Air Force Institute of Technology, 1994.
  • 10J C Pemberton. Toward Scheduling Over - Constrained Remote - Sensing Satellites[ C]. In Proceeding of the Second NASA International Workshop on Planning an d Scheduling for Space, Sn Francisco, CA,2000.

共引文献39

同被引文献7

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部