移动模架施工在立交桥建设中的应用 被引量:4

Application of Movable Frame in Interchange Construction
在线阅读 下载PDF
导出
摘要 移动模架不需要设置地面支撑,在施家梁立交桥的建设中使转跨周期缩小了2/3,大大提高了工作效率,经济效益也得到了显著的提高,且施工设备可重复利用,经济合理。施工时的受力与运营时受力一致,不需要增加施工受力钢筋,减少了建材消耗。 In the construction of Shijialiang Interchange, the ground support haven't movable frame, which makes the period of span-transfer reducing by 2/3, heightens ciency greatly, and advancing the economic benefit markedly. The construction method to be set for the work effi is economical and rational because the construction equipment can be reused. The stress in construction accords with that in operational period. It is not necessary to add force reinforcing steel bars in construction, thus the building material consumption is reduced.
出处 《交通标准化》 2010年第3期61-65,共5页 Communications Standardization
关键词 移动模架 施工技术 现浇箱梁 movable frame construction technique cast-in-site box beam
  • 相关文献

参考文献5

二级参考文献29

共引文献1827

同被引文献17

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部