摘要 根据水土保持法的有关规定和500kV平海电厂接入系统工程的实际情况,通过现场实际勘察和调查了解,分析了开发建设项目水土流失的特点,并进行了预测,编制了500kV平海电厂接入系统工程输变电水土保持方案。水土保持方案实施后,通过工程和植物措施的综合治理,可得到包括生态效益、社会效益和经济效益的综合效益。 Pursuant to relevant stipulations in the Law of the Peopleps Republic of China on Water and Soil Conservation , and in light of the actuslities of 500kV Pinghai Power Plant access system.The characteristics of soil and water losses of the construction project are analyzed upon field investigalim,,and a prediction has been made. The water and soileonservation scheme tbr the transmission line is prepared , which will enable ecological and socio-econnmic benefit through eomprehensive treatment in terms of engineering and plants.
作者 叶炜
出处 《价值工程》 2010年第1期152-154,共3页 Value Engineering
关键词 输电线路 水土流失 防治措施 overhead transmission line soil erosion and water loss prevention measures
  • 相关文献

参考文献2

  • 1GB/T50433-2008,开发建设项目水土保持技术规范[S].
  • 2中华人民共和国水利部.水土保持工程概算定额[M].郑州:黄河水利出版社,2003.

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部