全预制装配式变电站的建设体现了"资源节约型、环境友好型、工业化"的变电站设计建设要求和全寿命周期理论的运用,是通过工厂预制和现场安装两个阶段来建设变电站,以浙江省丽水市建设的110kV全预制装配式变电站为例,介绍了全预制装配式变电站的工程特点、工程中重点关注的问题。施工和运行的实践说明,这可以全面提高建设变电站的效率和效益,具有广泛的推广价值。
The construction of the prefabricated composite substation embodies the "resource-saving, environ- ment-friendly and industrialized" design and construction requirement, and applicates the life cycle theory. Its construction has two phases prefabrication in factories and field installation. Taking the 110 kV prefabricated composite substation in Lishui, Zhejiang as an example, the project features and key points are presented. Its construction and operation prove that it can improve the efficiency and performance in the construction of the substation comprehensively, and well worthy to promote.
出处
《供用电》
2010年第2期42-45,共4页
Distribution & Utilization
关键词
全预制装配式变电站
节能环保
生产预制
现场安装
prefabricated composite substation
energy-saving and environment-friendly
prefabricated products
field installation