摘要
结合无锡市新城污水处理厂升级提标工程,探讨了我国南方地区污水处理厂出水从《城镇污水处理厂污染物排放标准》(GB18918—2002)一级B标准升级提标到一级A标准的设计改造思路以及实施效果,为污水处理厂的升级改造提供参考。
Combined with the upgrading and reconstruction project of Wuxi Xincheng approach is made to the reconstruction design ideas and implementation result in upgrading from WWTP in Southern China from the first class B criteria to the first class A criteria Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918 WWTP, an the effluent specified in the - 2002). This provides a reference for upgrading and reconstruction of WWTP.
出处
《中国给水排水》
CAS
CSCD
北大核心
2010年第16期29-31,共3页
China Water & Wastewater
关键词
升级改造
一级A标准
滤布滤池
upgrading and reconstruction
first level A criteria
fabric filter