期刊文献+

自升式海洋平台桩腿齿条相位差分析研究 被引量:6

Application of RPD to the Offshore Self-elevating Units
在线阅读 下载PDF
导出
摘要 RPD是桁架式桩腿两相邻弦杆的垂向位移差。自升式海洋平台在升船、预压升船及预压载等工况下,桩腿RPD值不允许超过其最大可容许值。以一个桁架式桩腿的自升式海洋平台为例,论述了RPD计算原理和计算方法,进行了详细的数值计算,并分析得到桩腿的最大可容许RPD值。论文提供的方法和思路对自升式平台使用者及平台设计人员具有一定的指导意义。 The RPD represents the differential vertical displacement between each chord of one leg. The maximum allowable RPD is the value that should not be exceeded under jacking, pre-load jacking and pre-load holding conditions. Theory and method of RPD calculation are studied and suggested respectively in this paper. As an example, the maximum allowable RPD for a jack-up with truss legs is determined. This paper may be helpful to the rig owners, operators and designers.
出处 《中国造船》 EI CSCD 北大核心 2010年第A01期61-64,共4页 Shipbuilding of China
关键词 自升式平台 RPD 桁架式桩腿 升船 预压升船 预压载 Jack-up RPD truss leg jacking pre-load jacking pre-load holding
  • 相关文献

参考文献5

二级参考文献21

  • 1廖谟圣.三论我国海洋石油工业技术装备之国产化[J].中国海洋平台,2004,19(4):1-7. 被引量:9
  • 2Atwood Oceanics Inc. http://www. atwd. com
  • 3Choo Y S. Recent development and innovation in tubular structures [J]. Advances in Structural Engineering, 2005(3).
  • 4SNAME. Guidelines for Site Specific Assessment of Mobile Jack-up Units[S]. Technical & Research Bulletin 5-5A, Revision 2, January 2002.
  • 5Smith S F, et al. 3D nonlinear wave spreading on jackup loading and response and its impact on current assessment practice[A]. OTC[C], 2006:1- 13.
  • 6Offshore Magazine, 2004(4).
  • 7LeTourneau. http://www.letourneau-inc. com
  • 8....Friede & Goldman (友人与金人)http://www. fng. com,,..
  • 9BASS. http://www. bbengr. com
  • 10....BMC (贝克海洋)http://www. baker-marine. com,,..

共引文献80

同被引文献43

  • 1Kaijin HUANG Dawen ZENG Changsheng XIE Desheng XU.Numerical Simulation for Three-Dimensional (3D) Unsteady State Temperature Field in Circumferential Laser Oxygen Cutting of Pipes[J].Journal of Materials Science & Technology,2003,19(z1):147-150. 被引量:1
  • 2CCS.海上移动平台入级与建造规范[S].人民交通出版社.2005.
  • 3Parker D S, Hodge C G The electrical machines and drives[C]//International Conference lEE, 1997.
  • 4姚震球,等.海上风电吊装与运输专用工作船研发技术研究报告[R].江苏科技大学,2011.3.
  • 5姚震球,等.海上风机吊装船全船结构强度有限元分析报告[R].江苏科技大学,2010.8.
  • 6唐文献,姚震球,等.海上风电吊装船船体平台升降装置设计与结构应力计算分析报告[R].江苏科技大学,2011.2.
  • 7SNAME. Technical & research bulletin 5-5A recommended practice for site specific assessment of mobile Jack-Up units[S]. New Jersey: Society of Naval Architects and Marine Engineers, 2008.
  • 8MIKE J R H, JOHN J S. Jack-up site assessment - the voyage to an ISO[C]//Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011: 1-12.
  • 9STONOR R W P, HOYLE M J R, NELSON K, SMITH N P, HUNT R J. Recovery of an elevated jack-up with leg bracing member damage[J]. Marine Structures, 2004, 17(3-4): 325-351.
  • 10HARVEY D, HAROLD K. Noble's newbuild jackups incorporate system to monitor, combat rack phase differential[J]. Drilling contractor, 2006, 62(5): 24-26.

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;