期刊文献+

CIM模型在地铁施工安全风险评估中的应用 被引量:28

Application of the Controlled Interval and Memory Model in Safety Risk Evaluation of Subway Constructions
在线阅读 下载PDF
导出
摘要 文章对国内近年的地铁施工安全事故进行了统计分析,从事故原因的角度建立了地铁施工安全风险评价体系,构建了地铁施工安全风险CIM评估模型。运用这一模型对大连地铁工程一号线一期102标段进行了施工安全风险评估验证。结果表明,CIM模型在地铁风险评估中具有有效性和可操作性。 The statistical analysis was carried out on subway construction accidents in recent years in China.The safety risk evaluation system for subway constructions was set up from the view of the accidents.The evaluation model for Controlled Interval and Memory(CIM) in subway construction safety risk was developed.The model was verified on the construction of bid lot 102 in first-stage project of Dalian subway line 1 in China.The result shows the operability of CIM model in subway risk evaluation.
出处 《工程管理学报》 2010年第5期513-516,共4页 Journal of Engineering Management
关键词 地铁 施工安全 风险评估 CIM评估模型 subway construction safety risk evaluation controlled interval and memory evaluation model
  • 相关文献

参考文献6

二级参考文献30

共引文献108

同被引文献234

引证文献28

二级引证文献199

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部