摘要
文章对国内近年的地铁施工安全事故进行了统计分析,从事故原因的角度建立了地铁施工安全风险评价体系,构建了地铁施工安全风险CIM评估模型。运用这一模型对大连地铁工程一号线一期102标段进行了施工安全风险评估验证。结果表明,CIM模型在地铁风险评估中具有有效性和可操作性。
The statistical analysis was carried out on subway construction accidents in recent years in China.The safety risk evaluation system for subway constructions was set up from the view of the accidents.The evaluation model for Controlled Interval and Memory(CIM) in subway construction safety risk was developed.The model was verified on the construction of bid lot 102 in first-stage project of Dalian subway line 1 in China.The result shows the operability of CIM model in subway risk evaluation.
出处
《工程管理学报》
2010年第5期513-516,共4页
Journal of Engineering Management
关键词
地铁
施工安全
风险评估
CIM评估模型
subway
construction safety
risk evaluation
controlled interval and memory evaluation model