期刊文献+

套管开窗侧钻中钻头弯矩分析 被引量:6

Analysis of bending moment on the bit in sidetrack drilling
在线阅读 下载PDF
导出
摘要 在油田开采的过程中,为了达到提高采收率等目的,很多油田都在现场应用了开窗侧钻技术,并且取得了显著的经济效益。在以往的对下部钻具组合受力的分析中,一般默认钻头为铰支,与地层间无弯矩。然而,在实际的开窗侧钻过程中,钻头与地层和套管不均匀偏心接触,必然存在钻头弯矩。因此,在合理假设的基础上,通过数值积分的方法,建立了求解钻头弯矩的数学模型,并且应用VisualBasic2008语言编写求解、分析软件,最后给出了一个计算实例。结果分析表明:钻头弯矩是一个随着钻头的钻进逐渐变化的过程。钻头刚接触套管壁的时候弯矩比较大,随着和地层接触面积增大,弯矩逐渐变小,当钻头全部处在地层中,钻头的弯矩为零。 In the process of reservoir development,so as to achieve the purpose of enhanced oil recovery,many reservoirs applied sidetrack techniques and had achieved remarkable economic benefit.In the past,the stress analysis of the bottom hole assembly is indicated that the drill bit is hinged and no moment with formation.However,in the actual operating environment of drilling,the drill bit keeps touch eccentric with casing and formation,there must be moment on the drill bit.Therefore,given some of reasonable assumptions,the mathematical model is established through the method of numerical integration.The software of mechanical analysis is developed with Visual Basic 2008.At last,an application to field is provided.The results show:bending moment on the bit is gradually changing process with the drilling progress,the value of the moment is relatively large when the bit beginning to touch with the casing,with the contact area increasing,which will be reducing gradually.It is easy to know that bending moment on the bit is zero when the bit is completely in the formation.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2010年第5期13-16,共4页 Oil Drilling & Production Technology
基金 美国Smith公司项目"套管开窗模拟软件开发"的部分内容
关键词 开窗侧钻 套管 钻头 弯矩 数学模型 sidetrack casing drill bit moment mathematical model
  • 相关文献

参考文献5

二级参考文献75

共引文献95

同被引文献72

  • 1邹德永,王瑞和.刀翼式PDC钻头的侧向力平衡设计[J].石油大学学报(自然科学版),2005,29(2):42-44. 被引量:32
  • 2舒尚文,刘明国.东濮凹陷深井套管开窗侧钻技术探讨[J].钻采工艺,2006,29(5):20-23. 被引量:3
  • 3王延恒,曾传云,张柄顺,刘月军,吕志忠.潜山油藏水平井套管开窗侧钻技术[J].石油钻采工艺,2007,29(5):16-19. 被引量:12
  • 4张红生,郭永宾.套管防磨保护措施[J].石油钻采工艺,2007,29(6):116-118. 被引量:12
  • 5CUI Chuanzhi, ZHAO Xiaoyan. A study on the develop- ment technology of sidetracking wells in fault block reser- voirs during the high water cut stage [ J ]. Petroleum Sci- ence and Technology, 2013,31 ( 5 ) : 465-471.
  • 6FREHERS S, OGLIANI F, RUTH G, et al. Successful sidetracking of a well onshore Germany by integration of 3D vertical seismic profiling technology--a case study [ J ]. Geophysical Prospecting, 2012, 60 ( 6 ) : 1068- 1081.
  • 7HOGG C, BARKER R, PENANGOS V, et al. Milling low-side casing exit windows in horizontal wells: a case study[ R]. SPE 150347-MS, 2012.
  • 8PONTON C B, ROBERTS J M, FIPKE S R, et al. Are you on the right track with casing milling? innovative pre-cision-milled windows offer improved casing exit reliability for sidetracking and multilateral completions [ R ]. SPE 127764-MS, 2010.
  • 9ANYANWU O N, KLOTZ C, LABRECQUE D, et al. Optimized downhole mud motor delivers outstanding per- formance improvement in alaska coiled tubing drilling [R]. SPE 153474-MS, 2012.
  • 10DEWEY C H, CHILDERS R D. Planning for successful window milling operation[ R]. SPE 49255-MS, 1998.

引证文献6

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部