摘要 北京复八线地铁“大—热”区间南隧道施工时,拱顶遇到饱和含水的粉细砂层,此段隧道地处国贸立交桥下,又有多条地下管线,为了确保地下管线和地面交通的正常使用和安全运行,在国内首次实施了隧道内的水平冻结加固施工。本文论述了该工法的设计、关键技术的处理以及实际取得的效果,探讨了人工地层冻结和浅埋暗挖技术相结合的发展方向。 During the construction of the south railway tunnel in DaRe Area of Beijing Underground Railway System, there was a water saturated layer of fine sand on the roof of the tunnel area. The tunnel area is located under the Guomao Overpass and there are several underground pipelines located in the tunnel area. To assure a normal operation and safety of the pipelines and overpass , horizontal ground freezing method was applied to the tunneling for the first time in China. This paper has stated the design, the key technologies and the practical results of this method, and discussed the technical tendency in combination of the ground freezing and the excavation with a shallow depth.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 1999年第3期319-322,共4页 Chinese Journal of Geotechnical Engineering
关键词 冻结法 水平钻孔 地铁隧道 施工 freezing method, horizontal drilling,underground railway tunnel
  • 相关文献

参考文献3

  • 1-.地层冻结工程技术和应用:中国地层冻结工程40周年论文集[M].北京:煤炭工业出版社,1995..
  • 2陶龙光,城市地下工程,1996年
  • 3中国地层冻结工程40周年论文集,1995年

同被引文献688

引证文献123

二级引证文献971

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部