期刊文献+

梁柱外伸端板连接节点的计算模型 被引量:1

Calculation model of beam-to-column extended end plate connections
在线阅读 下载PDF
导出
摘要 钢框架中普遍采用的外伸端板连接是典型的半刚性节点连接,其极限承载力和初始刚度受到多种因素的影响。根据节点的传力特点,分别计算各组件的极限承载力和初始刚度,提出了外伸端板连接节点极限承载力和初始刚度的理论计算方法;通过与试验和有限元结果对比表明该计算方法具有足够的精确性。采用已有的三参数模型,对节点的弯矩-转角关系进行模拟。并对影响外伸端板连接性能的各因素进行了深入的探讨,为工程设计提供参考。 The Extended end plate connection in steel frame is a typical semi-rigid nodes connection,whose ultimate load-bearing capacity and initial stiffness are influenced by several factors.Based on its characteristic of transmitting fore,the ultimate load-bearing capacity and initial stiffness of each component were calculated and the calculation method of the ultimate load-bearing capacity and initial stiffness of the joint were generated.By comparing with the finite element results and experiment results,it is verified that the method is accurate.Its momemt-rotation relation relation is simulated by three-parameter power model.Finally,the main influencing factors for the extended end plate connection using proposed method are discussed accordingly,which can provide reference for the engineering design.
出处 《铁道科学与工程学报》 CAS CSCD 2010年第5期6-11,共6页 Journal of Railway Science and Engineering
基金 国家自然科学基金资助项目(51078354) 湖南省重点基金项目(10JJ2034)
关键词 外伸端板连接 极限弯矩 初始刚度 弯矩-转角曲线 extended end plate connections ultimate moment initial stiffness moment-rotation curve
  • 相关文献

参考文献11

  • 1Youssef N. A survey of moment - resisting frame bnildings affected by the 1994 Northridge Earthquake [ R]. National Institute of Standard and Technology, Gaithersburg, MD, 1995.
  • 2Architectural Institute of Japan. Reconnaissance report on damage to steel building structures observed from the 1995 Hyogoken - Nanhu ( Hanshin/Awaji ) Earthquake [ R ]. May, 1995.
  • 3陈惠发 周绥平.钢框架稳定设计[M].上海:世界图书出版社,1999..
  • 4卢小松,顾强,陈向荣.外伸式端板连接M-θ关系曲线控制参数的研究[J].建筑结构,2008,38(4):87-90. 被引量:3
  • 5Shi Y J, Chan S L, Wong Y L. Modeling for moment rotation characteristics for end - plate connections [ J ]. Journal of the structural engineering, ASCE, 1996, 122 (11) :1300 -1306.
  • 6王燕,郑杰.高强螺栓端板连接的撬力分析与研究[J].工业建筑,2008,38(9):99-103. 被引量:13
  • 7Jenkins W M, Huang H, Jefery P K, et al. Analytical M - θ curves for end - plate con - nections [ J ]. Jounral of the Division, ASCE, 1979,105:133-157.
  • 8Paker J A, Morris L J. A limit state design method for the tension region of bolted beam - column connections [ J ]. Struct Eng, 1977,55 (10) :446 -458.
  • 9Witteveen J, Stark J W, Bijloard F S. Welded and bolted beam - to - column connections [ J ]. Struct div ASCE, 1982,108(2) :433 -455.
  • 10James A S. Characterization of the strength, stiffness, and ductility behavior of t - stub conne - ctions [ J ]. Georgia Institute of Technology, 1985 ( 1 ) :658 - 664.

二级参考文献32

  • 1王素芳,陈以一,陈友泉,魏潮文.端板连接高强度螺栓群中和轴位置研究[J].建筑科学与工程学报,2005,22(3):45-54. 被引量:18
  • 2施刚,石永久,王元清.钢结构梁柱半刚性端板连接弯矩-转角全曲线计算方法[J].工程力学,2006,23(5):67-73. 被引量:23
  • 3粟一凡.材料力学[M].北京:高等教育出版社,1986..
  • 4FRYE M J, MORRIS G A. Analysis of flexibly connected steel frames [J]. Canadian Journal of Civil Engineers, 2001, 21(3): 280-291.
  • 5PETER P T C, CHAN S L. Vibration and deflection characteristics of semi-rigid jointed frames- Engineering Structures, 1997, 19(12) : 1001-1010.
  • 6SHI Y J, CHAN S L. Modeling for moment-rotation characteristic for end-plate connections[J].J. of Structural Engineering, 1996, 122 (11): 1300-1306.
  • 7Eurocode 3: Design of Steel Structures[ S]. European Committee for Standardization, 1992.
  • 8L. SIMES DA SILVE etc. Post-limit stiffness and ductility of end-plate beam-to-column steel joints [ J ]. Computer and Structures, 2002,80: 515-531.
  • 9CHEN W F. Practical Analysis for Semi-Rigid Frame Design [M]. World Scientific, 1999.
  • 10Eurocode 3 : Deisgn of Steel Structures [ S ] European Committee for Standardization, 1992.

共引文献121

同被引文献6

  • 1施刚,石永久,王元清,李少甫,陈宏.门式刚架轻型房屋钢结构端板连接的有限元与试验分析[J].土木工程学报,2004,37(7):6-12. 被引量:37
  • 2KRISHNAMURTHY N, AVERY L K JEFFREY P K,et al. Analytical M-0 curves for end-plate connections[J].Journal of the Structural Division, 1979,105 : 133-145.
  • 3BANIOTOPOULOS C C. On the separation process inbolted steel splice plates [J]. Journal of ConstructionalSteel Research, 1995,32(1) : 15-35.
  • 4ADEY B T,GRONDIN G Y,CHENG J JR. Cyclic loadingof end plate moment connections[J]. Canadian Journalof Civil Engineering,2011,27(4) :683-701.
  • 5DESSOUKI A K,YOUSSEF A H JBRAHIM M M. Behaviorof I-beam bolted extended end-plate moment connections[J]. Ain Shams Engineering Journa,2013-4(4) :685-699.
  • 6DUAN Shujin,JIN Kanhui,GENG Zhe. A new type ofcolumn base connection and its mechanical properties analysis[C]//New Developments in Structural Engineeringand Construction. Singapore: Research Publishing,2013:423-428.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部