摘要
本文针对我国矿山地质情况及短(中)期生产计划编制方法,以AutoCAD2009为开发平台,提出了一种能够反映矿山工程发展状态及几何约束关系的虚拟采场模型,并利用此模型建立采场时空数据库模型,实现采矿过程的回放及超前演示。
Concerning the topography of China's mines and the methods of (middle) -term production plan, based on the development platform of AutoCAD2009, the paper proposed a kind of virtual stope model which is able to reflect the developing condition of the mine project and the constraint geometric relationship, and made use of the model to build a model of time and space database, to achieve the playback of the mining process and the demonstration in advance.
出处
《测绘科学》
CSCD
北大核心
2011年第1期81-83,共3页
Science of Surveying and Mapping
基金
辽宁省教育厅创新团队项目(2007T077)
辽宁省教育厅项目(2008276)