摘要
水布垭大坝垫层料由砂石系统生产,通过生产工艺的调整,获得了级配良好的垫层料,解决了垫层料级配分离及加水难等问题。
The bedding material for Shuibuya Dam is prepared by sandstone system,and the fine gradation of bedding material can be achieved through regulating production technology,which can solve the problems of grading separation of bedding material and water addition.
出处
《水电与新能源》
2011年第1期50-52,共3页
Hydropower and New Energy
关键词
垫层料
制备工艺
质量控制
bedding material
preparing technology
quality control