基于图解法的内悬浮外拉线抱杆组塔受力分析 被引量:7

Diagrammatic Solution-based Force Analysis on Internal-suspended and External-guyed Rod-holding Tower Erection
原文传递
导出
摘要 采用图解法,对内悬浮外拉线抱杆分解组塔方法进行了受力分析,找出封闭多边形受力关系及各部受力间的相互影响,分析了各种工况下的受力大小及成因,提出了施工技术设计与吊装中的控制措施,可为铁塔组立施工技术设计及具体吊装实施提供参考。 Force analysis is conducted on the internal-suspended and external-guyed rod-holding tower erection by using diagrammatic solution method in order to find out the forces relationship of an enclosed polygon and their interactions.The forces and their genesis are analyzed for various working conditions for this erection method.And the construction technology design and controlling measures for davit-mounting are proposed,which can provide a reference for tower erection technology design and for practical davit-mounting.
出处 《电力建设》 2011年第2期119-122,共4页 Electric Power Construction
关键词 内悬浮外拉线抱杆 铁塔组立 图解法 受力分析 控制措施 施工技术 internal-suspended and external-guyed rod-holding tower erection diagrammatic solution method force analysis controlling method construction technology
  • 相关文献

参考文献10

二级参考文献42

共引文献119

同被引文献59

  • 1李庆林.特高压输电线路铁塔组立抱杆的方案选择[J].电力建设,2007,28(3):29-33. 被引量:43
  • 2刘万夫.内悬浮外拉线抱杆分解组塔的工器具静力计算[J].东北电力技术,2007,28(5):26-28. 被引量:1
  • 3DL5009.2-2004电力建设安全工作规程第2部分:架空电力线路[S].北京:中国电力出版社,2004.
  • 4GB/T20118-2006,一般用途钢丝绳[S].北京:中国标准出版社.2006.
  • 5Q/GDW 346—2009架空输电线路钢管塔组立施工工艺导则[S].北京:中国电力出版社,2010.
  • 6Q/GDW 153—2006 1 000 kV架空送电线路施工及验收规范[S]. 北京:中国电力出版社,2007.
  • 7Q/GDW 155—2006 1 000 kV架空送电线路铁塔组立施工工艺导 则[S].北京:中国电力出版社,2007.
  • 8李博之.高压架空输电线路施工技术手册(杆塔组立计算部分)[M].北京:中国电力出版社,2012:172-185.
  • 9国家电网公司交流建设分公司.架空输电线路施工工艺通用技术手册[M].北京:中国电力出版社,2012:397-401.
  • 10DL/T 5342-2006 750 kV架空送电线路铁塔组立施工工艺导则[S].北京:中国电力出版社,2006.

引证文献7

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部