摘要 为实现BAF工艺的高效稳定脱氮,采用了外加碳源的后置反硝化三级BAF工艺(C+N+DN)。研究了水温、污染物负荷、硝化液回流等条件下低碳氮比生活污水的脱氮效果。结果表明,在无硝化液回流的条件下,水温高于23℃时,系统具有高效稳定的脱氮效果,出水NH3-N稳定低于5mg/L;水温低于23℃时,系统出水NH3-N明显升高。当水温为12-23℃时,采取50%硝化液回流并降低负荷后,硝化和反硝化效果明显提高,C柱和N柱对NH3-N和TN的去除率分别提高了19%和22%,最终出水中NH3-N与TN稳定达到《城镇污水处理厂污染物排放标准》(GB18918—2002)一级A标准。 An exotic carbon source postposition denitrification three-stage biological aerated filter (BAF) (carbon oxidation stage one, ammonia oxidation stage two, denitrification stage three, C+N+DN) was employed to achieve stable and efficient nitrogen removal in BAF. The denitrifieation effects in low carbon/nitrogen ratio sewerage in the conditions of different temperature, pollutants loading rate and nitrified effluent reflux were studied. The results showed that the system had stable and efficient denitrification effects without nitrified effluent reflux when temperatureS23 ℃, and the effluent ammonia concentration was below 5 mg/L; while if the temperature -23℃, the effluent ammonia concentration would increase apparently. If the temperature was between 12℃ and 23℃, 50% nitrified effluent reflux was adopted and the load was decreased, the nitrification and denitrification effects were improved apparently, the ammonia and TN removal rate of C column and N column was improved by 19% and 22% respectively, and final effluent ammonia and TN concentrations all met the first grade A standard of "discharge standard of pollutants for municipal wastewater treatment plant" (GB 18918--2002).
出处 《给水排水》 CSCD 北大核心 2011年第5期134-138,共5页 Water & Wastewater Engineering
关键词 多级生物滤池脱氮水温污染物负荷硝化液回流 Muff-stage BAF Nitrogen removal Water temperature Pollutant load Nitrified effluent reflux
  • 相关文献

参考文献15

  • 1Chiou R J, Ouyang C F. The effect of recycle ratio on nitrogen removal in the combined pre denitrification/nitrification biofilter system Journal of ahemical technology and biotechnology, 2001, 76: 559-564.
  • 2郑俊,汪荣,张刚.回流比对前置反硝化BAF处理效果的影响研究[J].中国给水排水,2007,23(21):24-27. 被引量:17
  • 3李雨霏,韩洪军,张凌瀚.前置反硝化曝气生物滤池调试中出现的问题及解决措施[J].中国给水排水,2009,25(12):92-95. 被引量:12
  • 4张宝东,陶涛,易彪,李坚.厦门市筼筜污水处理厂BIOFOR工艺的优化改进[J].中国给水排水,2008,24(14):28-30. 被引量:6
  • 5Chudoba P, Pujol R. A three-stage biofiltration process: Performances of a pilot plant. Water Science and Technology, 1998, 38(8/9): 257-265.
  • 6Fdz Polanco F. Spatial Distribution of Heterotrophs and Nitrifiers in a Submerged. Water Research. 2000, 34(16):4081-4089.
  • 7Gilmore K R. Influence of Organic and Ammonia Loading Rate on Nitrifiers Activity and Nitrification Performance for a Two- Stage Biological Aerated Filter System. Water Science and Technology. 1999, 39(7):227-234.
  • 8张自杰,林荣忱,金儒林.排水工程:下册.北京:中国建筑工业出版社,1999.
  • 9Thegerson T, Hanson R. Full scale parallel operation of a biological aerated filter (BAF)and activated sludge (AS)for nitrogen removal. Water Science and Technology, 2000, 41(4/ 5) : 159-168.
  • 10朱小彪,许春华,高宝玉,何文君,岳钦艳.曝气生物滤池生物量和生物活性的试验研究[J].环境科学学报,2007,27(7):1135-1140. 被引量:34

二级参考文献12

共引文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部