期刊文献+

综放工作面快速过断层方法——预掘爆破巷 被引量:6

A way to pass through fault in fully mechanized caving face——pre-excavation blasting roadway
在线阅读 下载PDF
导出
摘要 断层是影响采煤工作面实现正常回采的一个重要因素。为解决1152综放工作面所遇落差为3.6m正断层的快速过断层问题,经深入研究分析,在该工作面运输巷预掘爆破巷,然后对巷道两帮坚硬岩石进行打眼、松动爆破,提前对影响工作面推进范围内的岩石进行处理。现场实践表明,消除了坚硬底板岩石对工作面正常推进的影响,实现了综放工作面快速过断层。 Fault is regarded as an important factor affecting the coal face to achieve a normal stoping.In order to resolve the 1152 face with a 3.6m normal fault,pre-excavation blasting roadway through the face transport is recommended from in-depth research,followed by drilling hard rock,loose blasting on the roadway,where the rock that affects the advancing is processed in advance to eliminate the effect of the hard rock in bottom,and a rapid passing through fault is finally realized.
作者 王晔
出处 《西安科技大学学报》 CAS 北大核心 2011年第3期267-270,共4页 Journal of Xi’an University of Science and Technology
关键词 综采放顶煤 断层 预掘爆破巷 fully mechanized caving fault pre-excavation blasting roadway
  • 相关文献

参考文献11

二级参考文献30

共引文献90

同被引文献57

引证文献6

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部