摘要
为了解决胜利油田垦东12块滩海油田的石油开采,在黄河入海口处极浅海域,建成进海路和人工岛组合系统,在岛上建设油井进行石油开采。本文根据已掌握的工程地区资料,对该地面工程开展调研和评价,介绍了进海路及人工岛工程方案,根据油藏分布的区块位置,由进海路将平台与陆地相联接,利用陆上设施进行勘探开发。同时指出,一个完备的工程设计是需要经过反复的初步方案比选才能得出安全又经济的最终方案。
To solve the problem of petroleum exploitation in the Kendong No.12 area in Shengli oil field,the system of the sea road and the artificial island has already been set up in the extremely-shallow-water area of Yellow River entrance so as to build oil wells for exploring oil.In this paper,according to the the reservoir location,the investation and the evaluation of the engineering on the land have been made.The engineering scheme of the sea road and the artificial island is also introduced.Based on the distribution of oil deposits,the sea road connects the platform with the land so as to make exploration by making use of the equipment on land.Meanwhile,in this paper,it points out that a complete,safe and economical design can be completed only through discussing the preliminary schemes repeatedly.
出处
《工程地球物理学报》
2011年第3期370-373,共4页
Chinese Journal of Engineering Geophysics
关键词
人工岛
设计
结构
海浪
artificial island
design
structure
wave