摘要
大台沟铁矿是国内迄今为止正在设计的深井开采特大型矿山,阶段运输水平设计采用分区运输,采用溜井组布置方式,卸矿线集中布置在矿体中央,矿石运输列车自控运行,可以较好地解决井下开采运输量大的难题。
Dataigou iron ore mine is the first deep mining large mine, and is being designed. The haulage level is divided into four areas. Three panel draw shafts is a group. Unloaded ore lines are compact arrangement. And automation control system is used in ore trains. All of them can solve the problem that Mining ores traffic is special big.
出处
《矿业工程》
CAS
2011年第4期26-27,共2页
Mining Engineering
关键词
大台沟铁矿
运输水平
设计
Dataigou iron ore mine
transportation level
design