期刊文献+

黄岛地下水封洞库洞室群合理主轴线方位探讨 被引量:2

Discussion on Reasonable Main Axis Azimuth of Cavern Group in Huangdao Groundwater Water-sealed Cave Storage
原文传递
导出
摘要 黄岛地下水封洞库洞室群规模大,且采用平行布置,洞室主轴线布置对洞室群稳定性至关重要。从地应力与结构面角度出发,运用有限差分法分析了洞库区地应力对洞室群主轴线布置的影响规律。在此基础上综合考虑结构面与地应力探讨了洞室群合理主轴线方位。 Because the cavern group in Huangdao underground water-sealed cave storage have large scale, and adopts the parallel arrangement, the arrangement of main axis in cave storage is important to the stability of cav- ern groups. From the view of ground stress and structure plane, the law of ground stress influencing to main axis arrangement are analyzed by FEM. On the basis, the main axis azimuth of cavern groups is discussed on com- prehensively considering the ground stress and structure plane.
作者 张玉升
出处 《勘察科学技术》 2011年第4期43-45,59,共4页 Site Investigation Science and Technology
关键词 地下水封洞库 主轴线 地应力 结构面 underground water-sealed cave storage main axis line ground stress structure plane
  • 相关文献

参考文献6

二级参考文献15

  • 1王敏强,侯发亮.板状破坏的岩体岩爆判别的一种方法[J].岩土力学,1993,14(3):53-60. 被引量:18
  • 2陶振宇.高地应力区的岩爆及其判据[J].人民长江,1987,(5):25-32.
  • 3谭以安.岩爆形成机理研究及综合评判[博士学位论文].西安:西安地质学院,1988..
  • 4郭怀志 等.岩体初始地应力场的分析方法.岩土工程学报,1983,(3):64-75.
  • 5邵敬东 赵永刚 夏勇.锦屏一级水电站可行性设计报告[R].国家电力公司成都勘测设计研究院,2000..
  • 6何江达 范景伟.四川狮子坪水电站地下厂房围岩稳定性三维有限元分析[R].四川大学,2002..
  • 7张建海 何江达 范景伟.二滩水电站地下厂房二号机组段岩体弹脆性开裂计算分析[R].四川大学,2000..
  • 8肖白云 杨建宏 王仁坤.金沙江溪洛渡水电站预可行性研究报告[R].电力工业部成都勘测设计研究院,1995..
  • 9何江达 范景伟 张建海.雅砻江官地水电站地下厂房围岩稳定性及支护效果分析[R].四川大学,1997..
  • 10马启超,戚蓝,侯晓暾.影响大型地下洞群围岩稳定的几个问题[J].岩石力学与工程学报,1998,17(增):846-853.

共引文献171

同被引文献41

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部