摘要 结合襄樊汉江三桥主墩大体积承台施工,分析了大体积承台施工技术,包括:钢板桩围堰施工,水下混凝土封底。为防止大体积混凝土在水化过程中结构内部产生过高的水化热温度,致使结构产生有害裂缝,从混凝土原材料到混凝土浇筑施工采取了一系列有效的技术控制措施,包括低水化热混凝土配合比设计、混凝土温控计算、大体积混凝土温度现场控制措施,以及施工过程中的温度监测,从而使得承台施工得以顺利完成。 Based on the large volume pile cap construction of Hanjiang the Third Bridge main pier in Xiangfan,the construction technology of the large volume pile cap is analyzed.,including cofferdam construction of steel sheet pile,bottom sealing of underwater concrete.A series of measures from concrete raw material to concrete pouring are taked to prevent exorbitant hydration temperature in mass concrete causing concrete crack,including mix design of low hydration heat concrete,temperature control calculation of concrete,field temperature control measures of mass concrete,temperature monitoring during construction.Thus,pile cap construction is completed successfully.
出处 《施工技术》 CAS 北大核心 2011年第9期29-32,共4页 Construction Technology
关键词 桥墩 围堰 混凝土施工 温度控制 piers cofferdams concrete construction temperature control
  • 相关文献

参考文献6

二级参考文献9

  • 1JFJ 041-2000,公路桥涵施工技术规范[S].
  • 2周水兴,何兆益,邹毅松.路桥施工计算手册[M].北京:人民交通出版社,2003.
  • 3JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 4刘秉京.混凝土技术[M].北京:人民交通出版社,2001..
  • 5王玲.高效减水剂和水泥之间适应性的影响因素[A].姚燕.新型高性能混凝土耐久性的研究与工程应用[C].北京:中国建材工业出版社,2004..
  • 6阎培渝.混凝土结构的裂缝与控制[A].姚燕.新型高性能混凝土耐久性的研究与工程应用[C].北京:中国建材工业出版社,2004..
  • 7冯乃谦.高性能混凝土[M].北京:中国建筑工业出版社,2003..
  • 8P.C. Aiticn, A. M. Neville. High performance concrete demystified[J]. Concrete International, 1993,15(1):21-26.
  • 9廉慧珍.对“高性能混凝土”十年来推广应用的反思[J].混凝土,2003(7):10-13. 被引量:61

共引文献99

同被引文献31

引证文献6

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部