The research and practice of major technological issues on design of Three Gorges Project

The research and practice of major technological issues on design of Three Gorges Project
在线阅读 下载PDF
导出
摘要 The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is endangered by large gentle-dip structural plane of the bedrock due to the deep excavation of powerhouse at the dam-toe.For the dam body concrete,the durability requirement is high and the temperature control and crack prevention are difficult.The practical experience which could be used for reference in the design and construction of asphalt concrete core wall for Maopingxi protective earth-rock dam is scarce.The power station operates with high water head and large head variation.The type selection of penstock and intake as well as the embedding way of spiral case are complicated in technique,and the tailrace tunnel with sloping ceiling of underground power plant is arranged instead of traditional tailrace surge tank.For the double-line five-step ship-lock,the design of fully lined ship-lock,high head delivery system and large-sized miter gates and hoists is very challenging due to high operation head,complicated delivery conditions and building in deep excavated rock.The preferred solutions,optimal schemes and technical measures for various structures,as well as the innovation achievements proved by practice are highlighted.
出处 《Engineering Sciences》 EI 2011年第3期22-30,共9页 中国工程科学(英文版)
关键词 Three Gorges Project structure DESIGN key techniques PRACTICE 工程设计 三峡大坝 技术 沥青混凝土心墙 泄洪能力 耗散结构 尾水隧洞 地下厂房
  • 相关文献

参考文献1

二级参考文献4

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部