万家寨引黄工程渣场整治与防护 被引量:1

Protection and Improvement of Spoil Area of Wanjiazhai Yellow River Diversion Project
在线阅读 下载PDF
导出
摘要 对万家寨引黄工程渣场的选址、防洪标准及整治措施进行了分析。认为:渣场选址应避开或远离大江大河;渣量大于20万m3的渣场防洪标准应定为20 a一遇,其他渣场防洪标准应定为10 a一遇;渣顶覆土应根据有关技术规范进行,土渣坡可不进行覆土,石渣坡应先覆土后种草或种植适合当地生长的柠条等;渣场施工时间应尽量选择在每年的3月下旬至6月底。 General situation of the spoil area of Wanjiazhai Yellow River Diversion Project was introduced and the protection and improvement methods were analyzed in this paper. The results show that the sites of the spoil area should be kept away from large rivers ; the standard of flood control frequency for the spoil area should be once in every 20 years for those with capacity exceeds 200 000 m3 and once in 10 years for others. Earthing- up for the top-field should be processed according to related technical criteria. The earthing-up practices may not necessarily be carried out for earth spoil slops, but for quarry rubbish slopes, it should be earthed-up first and followed with grass planting, or other plants suitable for the local conditions, for example Caragana intermedia. The construction time period for the spoil area should be from late March to late June.
作者 郑建红
出处 《人民黄河》 CAS 北大核心 2011年第12期79-80,共2页 Yellow River
关键词 水土保持 渣场防护 万家寨引黄工程 soil and water conservation spoil area protection Wanjiazhai Yellow River Diversion Project
  • 相关文献

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部