锦屏二级水电站大埋深、高地应力隧洞的岩爆及缩径问题探讨

Discussion of rock blasting and shrinkage problems of deeply buried tunnel with high earth stress of Jinping -2 Hydropower Project
原文传递
导出
摘要 无论交通工程还是输、引水工程,都不可避免的遇到隧洞开挖支护施工。尤其在大埋深、高地应力下,如何保证隧洞安全施工是一个值得探讨的问题,本文结合在锦屏二级水电站引水洞大埋深、高地应力下完整坚硬围岩引起的岩爆和软弱破碎围岩引起的“缩径”现象的处理经验,提出一些措施和看法,供类似工程施工时参考。 No matter it is traffic works or supply and abstraction works, support will be used for all tunnel excavations in the construction. Especially for deeply buried tunnels with high earth stress, how to ensure safety of tunnel construction and make construction products meet the design and specification requirements, it is a question to be worth discussing for construction persons. The paper proposes some measures and views as a reference for similar project construction according to the treatment practice of shrinkage caused by the rock blasting and weakly broken surrounding rock of deeply buried abstraction tunnel with high earth stress of Jinping - 2 Hydropower Project.
出处 《水电勘测设计》 2011年第1期16-20,共5页
关键词 隧洞施工 大埋深 高地应力 岩爆 缩径 tunnel construction deeply buried high earth stress rock blasting shrinkage
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部