关于曹妃甸某排水管道CIPP壁厚设计的歧义

Design Various Interpretations of Wall Thickness of Drainage Pipe in Caofeidian
在线阅读 下载PDF
导出
摘要 本文根据曹妃甸某排水管道的招标文件,概要介绍了曹妃甸厂区待修复排水管道的运行状况和修复实践,并分别就不同CIPP工法(软管翻转法、软管拉入加热固化法、软管拉入紫外线固化法)遵照ASTMF1216—05规定,计算出内衬层厚度,并与招标文件对比,指出其不足。希望引起排水业界对CIPP工艺适用范围的关注,在应用中加强技术评价工作,以进一步促进管道非开挖修复事业在我国的健康发展。 This paper briefly discusses the drainage pipe repaired technology of CIPP pulled-in-place with UV curing process, technical advantages; Also discussed the UV curing process there may be technical shortcomings, want to arouse drainage management concerns on the scope of application of UV curing process ,in application to strengthen the technical evaluation work, in order to further promote the healthy development of the pipeline trenchless rehabilitation industry in China.
出处 《非开挖技术》 2011年第6期45-47,共3页 China Trenchless Technology
关键词 排水管道 原位内衬修复 非开挖 拉入法 紫外光固化 Drain Pipe, CIPP, Trenchless, Lining Rehabilitation, Pulled-in-Place, UV Cure, Glass Fiber
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部