摘要
以港珠澳大桥为例,重点研究和探索大型桥梁工程施工中的测量监控与管理方法。分析了大型桥梁施工测量监控管理的工作目标、主要任务和工作内容,提出港珠澳大桥监控与管理的总体工作思路,探讨了大型桥梁施工测量监控与管理的工作方法,最后讨论了大型桥梁施工测量控制中的协调与管理方法。
With Hong Kong-Zhuhai-Macao bridge as an example, construction surveying for control and management methods of large-scale bridges are studied. The goal, major tasks and working contents of construction surveying for control and management of large-scale bridges are analyzed and discussed. The general idea of construction surveying for control and management of Hong Kong-Zhuhai-Macao bridge is proposed. The detail working methods of construction survey are explored. Finally the methods of coordination and management for large-scale bridges construction are discussed.
出处
《工程勘察》
CSCD
2012年第1期66-68,80,共4页
Geotechnical Investigation & Surveying
关键词
港珠澳大桥
工程施工
测量监控与管理
Hong Kong-Zhuhai-Macao bridge
engineering construction
construction surveying for control and management