摘要
近年来PHC管桩在各类建筑物基础中得到广泛应用,创造了显著的社会经济利益,显示出其优越的综合性能,但在应用过程中也出现不少技术问题,如挤压效应以及基桩上浮等,本文以韶关新丰某水泥厂工程为例展开论述以供同行参考。
In recent years,PHC pile foundation is applied more and more,creating significant social and economic benefits,showing the excellent overall performance. But in the application process,there are many technical problems,such as squeeze-and floating pile,etc.. This paper discusses the Shaoguan Xinfeng Cement Plant for peer participation.
出处
《广东土木与建筑》
2011年第8期23-26,共4页
Guangdong Architecture Civil Engineering
关键词
岩溶地区
PHC管桩
挤土效应
上浮
karst area
PHC pile
effect of soil compaction
floating