猴子岩水电站施工导流设计概述 被引量:3

Design of Construction Diversion at Houziyan Hydropower Station
在线阅读 下载PDF
导出
摘要 猴子岩水电站地处高山峡谷地区,工程规模巨大,地质条件复杂,施工导流方案选择受到诸多不利因素的制约。通过对工程条件进行认真分析和研究,成功地解决了导流洞和围堰布置的难题,为尽早确定施工导流设计方案和枢纽总布置方案、加快工程建设进度创造了条件。 Houziyan hydropower station is located in deep valley with high slopes.Due to huge sized project and difficult geological conditions,construction diversion options are limited by many unfavorable factors.By careful analysis and study on project conditions,the difficult problems about diversion tunnels and cofferdam arrangements are successfully solved.This provides conditions for earlier determination of construction diversion design scheme and general layout of project,also faster project construction progress.
作者 张有山 梁娟
出处 《四川水力发电》 2012年第1期39-42,160,共4页 Sichuan Hydropower
关键词 猴子岩水电站 施工导流设计 Houziyan hydropower station construction diversion design.