摘要
AHP和TOPSIS相结合可以实现评价方法的易操作性,提高结果的客观和准确程度。文章建立地铁车站方案优化排序的数学模型,对大连地铁1号线海事大学车站施工方案进行比选。通过实地调研和文献查阅完成专家调查表,采用AHP法计算各指标的权重,并用改进的TOPSIS法进行评价指标值的规范化和排序计算,最终确定选择方案。
Integrating AHP and TOPSIS methods not only may realize the operability of appraisal method,but also can enhance the objective and accurate degree.This paper builds a mathematic model for choosing construction planning of subway stations in Dalian.The expert advice questionnaire is accomplished based on literature review and field investigation.This paper calculates every index through AHP and applies the modified TOPSIS method to normalize and sort the evaluation index values.A case of the construction planning decision of the Maritime University Station,Line One in Dalian is investigated.
出处
《工程管理学报》
2012年第2期33-36,共4页
Journal of Engineering Management