基于微粒群优化算法的计划评审技术改进 被引量:2

Improved program evaluate review technique based on particle swarm optimization algorithm
在线阅读 下载PDF
导出
摘要 针对项目进度管理中常用的计划评审技术(PERT)缺乏方向性指示和定量标准化的不足,通过引入微粒群优化(PSO)算法,提出了一种基于PSO对PERT的改进方法。该方法利用PERT对项目工序时间确定的方法,结合标准PSO算法的思想及原理,对传统PERT进行了改进。仿真实验结果表明,改进后的PERT对项目的过程和整体给出了一个更为优化、更为准确的定量控制标准,比传统的PERT对整个项目过程的控制和调节能力更加突出和有效。 Concerning the lack of directional instructions and quantitative standardization in the Program Evaluation Review Technique(PERT) that is commonly used in the progress of project management,an improved method of PERT based on Particle Swarm Optimization(PSO) was proposed through the introduction of PSO.The method used the PERT method of determining the process time on the project and combined the ideas and principles of the standard PSO algorithm to improve the traditional PERT.The simulation results show that the improved PERT gives a more optimized and more accurate quantitative control standards on the project process,can get better controlling and regulating ability to the whole project process compared with the traditional PERT.
出处 《计算机应用》 CSCD 北大核心 2012年第6期1734-1737,共4页 journal of Computer Applications
关键词 项目管理 进度管理 微粒群优化算法 计划评审技术 project management plan management Particle Swarm Optimization(PSO) Program Evaluate Review Technique(PERT)
  • 相关文献

参考文献8

二级参考文献46

共引文献23

同被引文献18

  • 1李阳,于海山,沈琴,张守忠.改进的PERT项目工期估算方法[J].工业工程与管理,2007,12(4):38-42. 被引量:16
  • 2Castro J, G6mez D, Tejada J. Allocating slacks in stochasticPERT network [J]. Central European Journal of Operations Research, 2014, 22(3) : 37 - 52.
  • 3Konstantinos A C, Basil K P. Approaching activity duration in PERT by means of fuzzy sets theory and statistics[J]. Journal of Intelligent &Fuzzy Systems, 2014, 26(2) : 577 -587.
  • 4Keefer D L, Verdini W A. Better estimation of PERT activity times[J]. Management Science, 1993, 39(9): 1086-1091.
  • 5Hahn E D. Mixture densities for project management activity times: a robust approach to PERT[J]. European Journal of Operational Research, 2008, 188(2) : 450 -459.
  • 6Sasieni M. A note on PERT times[J]. Management Science, 1986, 32(12): 1652-1653.
  • 7Herrerl'as-Velasco J M, Herrerl'aPleguezuelo R, Van Dorp J R. Revisiting the PERT mean and variance[J]. European Jour- nal of Operational Research, 2011, 210(2) : 448 - 451.
  • 8Miklos H, Orsolya B. The effects of different activity distribu tions on project duration in PERT networks[J]. ProcediSocial and Behavioral Sciences, 2014, 119 : 766 - 775.
  • 9Mouhoub N E, Benhocine A, Belouadah H. A new method for constructing a minimal PERT network[J]. Applied Mathemat ical Modelling, 2011, 35(9) : 4575 - 4588.
  • 10Hashemin S S, Fatemi Ghomi S M T, Modarres M. Optimal constrained non renewable resource allocation in PERT networks with discrete activity times[J]. Sharif University of Technology, 2012, 19(3) : 841 -848.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部