摘要
针对新疆焦煤集团2130煤矿25221工作面地质条件恶劣,煤层倾角大,煤层赋存较厚等情况,结合现有煤矿开采技术综合考虑,决定25221工作面采用一次采全高综合机械化采煤工艺,通过对地质条件、综合机械化采煤设备的研究,制定了最佳的施工方案,实现了大倾角综采工作面综合机械化采煤设备的快速安装。
According to the situations which geological condition is bad,dip angle of coal seam is large and coal seam occurrence is thick in 25221 working face of 2130 coal mine of Xinjiang coking coal group,combining with the coal mining technology comprehensively consider,decide that use full-seam mining comprehensive mechanized coal mining technology in 25221 working face,through the study of the geological condition and the comprehensive mechanized coal mining equipment,make the best of construction project,realize the fast installation of the comprehensive mechanized coal mining equipment of large dip angle fully mechanized working face.