期刊文献+

基于Bayes理论的五轴加工中心MTBF指标预测方法

MTBF Estimation for Five-Axis Machining Center Based on the Bayesian Theory
在线阅读 下载PDF
导出
摘要 根据量产的相似机床产品的历史失效数据确定某五轴加工中心MTBF的先验分布,应用Wilcoxon-Mann-Whitney秩和检验法对先验信息与现场数据进行相容性检验,利用Bayes方法融合先验信息和该加工中心小子样现场失效数据对其进行实时可靠寿命预测.研究表明:该加工中心的故障时间满足β=1.909 3,α=919.495 1的两参数Weibull分布;加工中心MTBF的点估计值为815.80(h),区间估计结果为[576.70(h),1 232.42(h)].所述方法适用于小子样情况,对特种机械产品的可靠寿命预测与评估具有普遍意义. The prior distribution of the mean time between failures (MTBF) of a machining center was obtained according to the previous failure data from similar machine tools produced in batches, and the compatibility of the prior information with the in-situ data was examined using the Wilcoxon-Mann-Whitney rank sum test. The reliable life of the machining center was predicted online based on the Bayesian theory combined with the prior distribution data and the small sample failure data of the machining center. The results show that the failure time distribution of the machining center follows the two-parameter Weibull distribution, i.e. , β = 1. 909 3, α = 919. 495 1. The point estimation value of the MTBF is 815.80(h) and its interval estimation value is [576.70(h), 1 232.42(h)J. The method proposed is suitable for the small sample situation, which is meaningful for the reliabe life prediction of special manufacturing equipment.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2012年第8期1182-1185,共4页 Journal of Northeastern University(Natural Science)
基金 国家科技重大专项基金资助项目(2009ZX04014-014) 辽宁省博士科研启动基金资助项目(201120005)
关键词 加工中心 可靠性 平均故障间隔时间(MTBF) BAYES方法 小子样 machining center reliability MTBF (mean time between failures) Bayesian theory small sample
  • 相关文献

参考文献10

  • 1Chen B J, Chen X F, Li B, et al. Reliability estimation for cutting tools based on logistic regression model using vibration signals[J]. Mechanical Systems and Signal Processing, 2011,25(7) :2526 - 2537.
  • 2Wang Y Q, Shen G X, Jia Y Z. Multidimensional force spectra of CNC machine tools and their applications, part two: reliability design of elements[J].International Journal of Fatigue, 2003,25(5) :447 452.
  • 3Zhu S W, Ding G F, Qin S F, et al. Integrated geometric error modeling, identification and compensation of CNC machine tools[J ]. International Journal of Machine Tools and Manufacture, 2012,52(1) :24 - 29.
  • 4Dai Y, Zhou Y F, Jia Y Z. Distribution of time between failures of machining center based on type I censored data[J]. Reliability Engineering and System Safety, 2003,79 (3) : 375 377.
  • 5Braglia M, Carmignani G, Frosolini M, eta[. Data classification and MTBF prediction with a multivariate analysis approach [ J ]. Reliability Engineering and System Safety, 2012,97(1) :27 - 35.
  • 6张宏斌,贾志新,郗安民.电火花线切割机床平均故障间隔时间分布模型的研究[J].机械设计与制造,2009(10):178-180. 被引量:3
  • 7戴怡,张航军,贾亚洲.加工中心MTBF值的点估计与区间估计[J].天津工程师范学院学报,2007,17(2):16-18. 被引量:3
  • 8明志茂,张云安,陶俊勇,陈循.研制阶段系统可靠性增长的Bayesian评估与预测[J].机械工程学报,2010,46(4):150-156. 被引量:15
  • 9Li D C, Chang F M, Chen K C. Building reliability growth model using sequemla~ experiments and the Bayesian theorem for small datasets[ J ]. Expert Systems with Applications, 2010,37(4) :3434 - 3443.
  • 10Li D C, Chen C C, Chang C J, et al. A tree-based-trend- diffusion prediction procedure for small sample sets in the early stages of manufacturing systems[ J ]. Expert Systems with Applications, 2012,39(1) : 1575 - 1581.

二级参考文献18

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部