期刊文献+

考虑工人行走的作业时间随机分布的U型线平衡 被引量:4

Stochastic U-Line Balancing with Operators' Walking Time Considered
在线阅读 下载PDF
导出
摘要 针对工人作业时间随机分布并与工人行走路径时间相互独立的U型线平衡问题,运用遗传算法与仿真建模分析相结合的方法求解。在给定的节拍与完工率下,以最小化工作站数目为目标,设计遗传算法求解作业元素分配序列。基于作业序列建立U型线布局仿真模型,模拟工人行走路径以及工人作业时间的随机分布,仿真结果得到各个工作站实际完工率达到给定的完工率下的最小工作站数,并得出工人行走时间不可忽略。最后结合实例验证方法是有效的。 In a U-type production line,often the operation time is subject to random fluctuation and it takes time for an operator to go from one workstation to another.With these factors considered,the U-line balancing problem is addressed in this paper.Given cycle time and workstation completion rate,a mathematical model of minimizing the number of workstations is presented.Then,a solution method that combines genetic algorithm and simulation is proposed.Based on the layout of the line and the precedence relation of the tasks,an operator's walking route can be determined by simulation.Thus,the time taken for operator's walking is obtained,so is the time for processing a task.In this way,the balancing problem can be solved.A numerical example is given to show the effectiveness of the approach.
出处 《工业工程》 北大核心 2012年第4期124-130,共7页 Industrial Engineering Journal
基金 广东省科技计划创新方法工作专项资助项目(2011B061100001)
关键词 U型线平衡 随机作业时间 仿真 遗传算法 U-line balancing random processing time simulation genetic algorithm
  • 相关文献

参考文献4

二级参考文献16

  • 1曹振新,朱云龙,赵明扬,尹朝万,李富明.混流装配线负荷平衡与投产排序的优化研究[J].信息与控制,2004,33(6):660-664. 被引量:24
  • 2王福林,王吉权,吴昌友,吴秋峰.实数遗传算法的改进研究[J].生物数学学报,2006,21(1):153-158. 被引量:30
  • 3唐秋华,席忠民,陈平和,严运兵.面向高效精准柔性混装作业的智能元胞调度方法研究[J].武汉科技大学学报,2007,30(4):379-383. 被引量:3
  • 4郑秀嫒等.运动生物力学进展[M].北京:国防工业出版社,1998.
  • 5M.伍科布拉托维奇.步行机器人和动力型假
  • 6RAHIMI VAHED A R, RABBANI M, TAVAKKOLI MOGHADDAM R, et al. A multi objective scatter search for a mixed model assembly line sequencing problem [J]. Advanced Engineering Informatics, 2007, 21 (1) : 85-99.
  • 7MILTENBURG J, SINNAMON G. Scheduling mixed model multi-level just in time production systems [J]. International Journal of Production Research, 1989,27(9) :1487- 1509.
  • 8BUKCHIN Y, RABINOWITCH I. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs[J]. European Journal of Operational Research, 2006,174 ( 1 ) : 492 508.
  • 9SIMARIA A S, VILARINHO P M. A genetic algorithm based approach to the mixed-model assembly line balancing problem of type Ⅱ [J]. Computers & Industrial Engineering, 2004, 47 (4) :391-407.
  • 10VILARINHO P M, SIMARIA A S. A two-stage heuristic method for balancing mixed model assembly lines with parallel workstations [J]. International Journal of Production Research, 2002, 40 (6): 1405-1420.

共引文献64

同被引文献24

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部