摘要
以汝郴高速公路赤石特大桥为例,对施工过程中爬模爬架设计、动力控制系统设计、爬模过程控制及主要危险源的控制进行重点研究,为爬模的安全使用及桥梁建设质量提供了保证。
Taking Chishi Grand Bridge of Ruchen Expressway as an example, the design of climbing form and climbing frame, the design of power control system, climbing form process control, and the control of main hazard source were studied, which guarantees the safe use and construction quality of the bridge
出处
《筑路机械与施工机械化》
2012年第9期69-72,共4页
Road Machinery & Construction Mechanization
关键词
特大桥
液压爬模
安全管理
安全控制
grand bridge
hydraulic climbing form
safety management
safety control