针对漳山发电厂2号机组发电机氢气纯度下降过快的问题,通过对有关设备和系统的全面分析,查明了原因并进行了有效的处理,取得了良好的效果。
In connection with problem that the hydrogen purity of generator of unit No. 2 in Zhangshan Power Plant rapidly decreased,through a comprehensive analysis of related equipment and systems,the causes was identified and the effective processing was conducted, the good results were achieved.